Final | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 09:59:20. Contact: ###-####.
|
Final | 6/21/2000 | 6/22/2000 | 6/22/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 17:01:29. Contact: ###-####. No access 6/22/00 2:12:40 PM
|
Final | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 08:39:04. Contact: ###-####. Left c/N 6/21/00 11:11:23 AM
|
Final | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/15/2000 at 09:25:59. Contact: ###-####. Locked 6/16/00 8:58:20 AM
|
Rough-in | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/15/2000 at 13:37:24. Contact: ###-####. NEED 1/4" RISE PER FT AT CONNECTOR
|
Pressure Test | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:44:29. Contact: ###-####. fireplace is included in permit already done. 3/14/00 1:51:38 PM
|
Rough-in | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:44:12. Contact: ###-####.Fireplace is included in permit Left C/N. 3/14/00 1:51:54 PM
|
Pressure Test | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 15:58:16. Contact: ###-####.
|
Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 15:57:57. Contact: ###-####. See C/N. 3/9/00 11:38:22 AM
|