Final | 10/13/2000 | 10/13/2000 | 10/13/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 08:48:59. Contact: ###-####. FOR ACCESS KEY ABOVE FRONT DOOR
|
Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 14:02:56. Contact: ###-####. scheduled by mistake........ 9/22/2000 10:31:32 AM
|
Rough-in | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Alan Hauser
|
|
|
fireplace only Western Heating ###-####
|
Rough-in | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
Alan Hauser
|
|
|
fire place only ###-#### Left C/N 4/4/00 9:37:45 AM
|
Pressure Test | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:07:06. Contact: ###-####.
|
Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:06:37. Contact: ###-####.
|