Final | 5/12/2000 | 5/15/2000 | 5/15/2000 | P | FAIL |
Alan Hauser
|
|
|
###-#### Left C/N- locked. 5/16/00 10:01:56 AM
|
Final | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | FAIL |
Alan Hauser
|
|
|
###-#### Left C/N 4/14/00 3:10:00 PM
|
Pressure Test | 2/8/2000 | 2/9/2000 | 2/9/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/08/2000 at 19:01:12. Contact: ###-####. Pressure test only approved.
|
Pressure Test | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/07/2000 at 10:46:17. Contact: ###-####.
|
Rough-in | 2/6/2000 | 2/7/2000 | 2/7/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/06/2000 at 22:33:06. Contact: ###-####. R/I fail/ 2/7/00 1:30:59 PM
|