Final | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Dixie Fellows
|
|
|
first house on the left Advanced Heating ###-####
|
Final | 3/30/2000 | 3/30/2000 | 3/30/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/30/2000 at 10:13:22. Contact: ###-####. No address posted 3/31/00 8:55:12 AM
|
Final | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 10:54:18. Contact: . Installation not complete 3/28/00 1:36:34 PM
|
Pressure Test | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 09:06:44. Contact: ###-####.
|
Rough-in | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | CANC |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 08:46:13. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/10/2000 at 09:05:24.
|
Pressure Test | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | PASS |
Wes Worcester
|
|
|
|
Rough-in | 2/9/2000 | 2/9/2000 | 2/9/2000 | P | FAIL |
Wes Worcester
|
|
|
###-####
|