Final | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 08:17:30. Contact: ###-####. Left C/N 5/5/00 10:19:16 AM
|
Pressure Test | 2/25/2000 | 2/28/2000 | 2/28/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 13:51:30. Contact: ###-####.
|
Rough-in | 2/25/2000 | 2/28/2000 | 2/28/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 13:50:59. Contact: ###-####.
|