Rough-in | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 9/1/2000
|
Final | 4/14/2000 | 4/14/2000 | 4/14/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 08:47:08. Contact: ###-####.
|
Rough-in | 2/22/2000 | 2/22/2000 | 2/22/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/22/2000 at 08:51:35. Contact: ###-####. PT ok. 2/23/00 1:51:30 PM
|
Rough-in | 2/16/2000 | 2/17/2000 | 2/17/2000 | P | FAIL |
Alan Hauser
|
|
|
###-#### PT failed. 2/18/00 9:50:18 AM
|