Final | 6/28/2000 | 6/29/2000 | 6/29/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/28/2000 at 10:51:22. Contact: ###-####.
|
Pressure Test | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 12:29:03. Contact: ###-####.
|
Pressure Test | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 14:03:50. Contact: ###-####. Not complete piping. 5/26/00 12:21:44 PM
|