Final | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 15:58:38. Contact: ###-####. Sign occ. card 3/6/00 1:52:50 PM
|
Rough-in | 2/17/2000 | 2/18/2000 | 2/18/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 15:19:13. Contact: ###-####. R/I ok return air ducted ok. 2/18/00 3:29:54 PM
|
Rough-in | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/18/2000 at 08:46:18. Contact: ###-####. Duct RA 2/18/00 3:36:34 PM
|
Rough-in | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Jim Storey
|
|
|
Return air ducted in ceiling/floor.
|