Final | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 13:26:22. Contact: ###-####. Sign occ. card 3/22/00 1:00:51 PM
|
Rough-in | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | PART |
Alan Hauser
|
|
|
###-#### John Shaft ok- no hood. 3/17/00 10:32:55 AM
|
Rough-in | 3/13/2000 | 3/14/2000 | 3/14/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 11:34:21. Contact: ###-####. Not ready. 3/14/00 2:04:36 PM
|
Rough-in | 3/7/2000 | 3/8/2000 | 3/8/2000 | A | FAIL |
Dave Lightfoot
|
|
|
conference Bob ###-#### Conference on type 1 hood. 3/8/00 2:09:18 PM
|