Final | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/06/2000 at 08:20:07. Contact: ###-####.
|
Final | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 12:29:01. Contact: ###-####. CALL SCOTT ###-#### BEFORE YOU GO boiler vent clearance 11/3/2000 11:48:55 AM
|
Final | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 13:23:45. Contact: ###-####. different brands of flue..need to be the same 11/2/2000 10:39:46 AM
|
Final | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 15:52:55. Contact: ###-####. need vent clearance 11/1/2000 11:56:22 AM
|
Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:51:57. Contact: ###-####. CALL SCOTT AT TML WHEN YOU ARE READY TO GO OUT.###-####-- CANCEL PER VERONICA
|
Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 08:51:57. Contact: ###-####. CALL SCOTT AT TML WHEN YOU ARE READY TO GO OUT.###-#### no time 11/1/2000 7:04:56 AM
|
Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:30:51. Contact: ###-####. as late as possible
|
Rough-in | 3/22/2000 | 3/23/2000 | 3/23/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 13:12:31. Contact: ###-####. Floor hyronics 3/24/00 9:31:20 AM
|
Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/08/2000 at 14:54:24. Contact: ###-####. Part. R/I ok- need to inspect slab heating. 3/9/00 2:19:46 PM
|
Pressure Test | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 14:51:43. Contact: ###-####.
|
Pressure Test | 3/3/2000 | 3/3/2000 | 3/3/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 07:30:36. Contact: ###-####. Bad test gage- use nipple and cap in wall. 3/6/00 11:46:17 AM
|