Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberMEC00-00712
StatusFinaled
Name TML LLC
Site Address 2807 W CRESCENT RIM DR
Project Name 
Customer Number 
ePlanReview 
Description
the two misc, are for Boilers
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/6/200011/6/200011/6/2000PPASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/06/2000 at 08:20:07. Contact: ###-####.
Final11/2/200011/3/200011/3/2000AFAIL
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/02/2000 at 12:29:01. Contact: ###-####. CALL SCOTT ###-#### BEFORE YOU GO boiler vent clearance 11/3/2000 11:48:55 AM
Final11/1/200011/2/200011/2/2000AFAIL
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 11/01/2000 at 13:23:45. Contact: ###-####. different brands of flue..need to be the same 11/2/2000 10:39:46 AM
Final10/31/200011/1/200011/1/2000AFAIL
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 10/31/2000 at 15:52:55. Contact: ###-####. need vent clearance 11/1/2000 11:56:22 AM
Final10/31/200010/31/200010/31/2000PCANC
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 10/31/2000 at 08:51:57. Contact: ###-####. CALL SCOTT AT TML WHEN YOU ARE READY TO GO OUT.###-####-- CANCEL PER VERONICA
Final10/31/200010/31/200010/31/2000PCANC
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 10/31/2000 at 08:51:57. Contact: ###-####. CALL SCOTT AT TML WHEN YOU ARE READY TO GO OUT.###-#### no time 11/1/2000 7:04:56 AM
Final10/30/200010/30/200010/30/2000PNR
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 10/30/2000 at 09:30:51. Contact: ###-####. as late as possible
Rough-in3/22/20003/23/20003/23/2000PPART
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/22/2000 at 13:12:31. Contact: ###-####. Floor hyronics 3/24/00 9:31:20 AM
Rough-in3/8/20003/9/20003/9/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/08/2000 at 14:54:24. Contact: ###-####. Part. R/I ok- need to inspect slab heating. 3/9/00 2:19:46 PM
Pressure Test3/3/20003/6/20003/6/2000APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/03/2000 at 14:51:43. Contact: ###-####.
Pressure Test3/3/20003/3/20003/3/2000PFAIL
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/03/2000 at 07:30:36. Contact: ###-####. Bad test gage- use nipple and cap in wall. 3/6/00 11:46:17 AM