Final | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/10/2000 at 11:59:55. Contact: ###-####.
|
Pressure Test | 3/16/2000 | 3/17/2000 | 3/17/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/16/2000 at 15:04:56. Contact: ###-####.
|
Rough-in | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/15/2000 at 15:42:23. Contact: ###-####. Gas test failed 3/16/00 2:27:58 PM
|