Final | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/10/2000 at 15:07:49. Contact: ###-####.
|
Final | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | FAIL |
Alan Hauser
|
|
|
###-#### Left C/N 5/11/00 11:44:46 AM
|
Final | 5/8/2000 | 5/9/2000 | 5/9/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 17:13:49. Contact: ###-####. not ready
|
Final | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | FAIL |
Alan Hauser
|
|
|
Greg Everhart ###-#### Talked to contractor 5/9/00 11:33:39 AM
|
Rough-in | 3/29/2000 | 3/29/2000 | 3/29/2000 | A | PASS |
Dixie Fellows
|
|
|
Pressure/CN ok. B-vent to remain exposed in garage(connector)
|
Rough-in | 3/27/2000 | 3/28/2000 | 3/28/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 13:22:03. Contact: ###-####.
|
Rough-in | 3/23/2000 | 3/27/2000 | 3/27/2000 | A | FAIL |
Dixie Fellows
|
|
|
###-#### NO 90' OFFSETS IN B-VENT..GAS UNDERSIZED
|