Final | 5/30/2000 | 5/30/2000 | 5/30/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 11:11:21. Contact: ###-####.
|
Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 15:19:20. Contact: ###-####.
|
Rough-in | 3/21/2000 | 3/22/2000 | 3/21/2000 | A | CANC |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 15:14:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/21/2000 at 15:18:27.
|