Permit NumberMEC00-00857
StatusFinaled
Name TML LLC
Site Address 928 W MAIN ST
Project NameIDANHA
Customer Number 
ePlanReview 
Description
HVAC PER PLANS $97,057.00///Final cert of value $116,120.00//6/19/03 BAM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/16/200111/19/200111/19/2001APASS
DetailsAlan Hauser
Scheduled by Inspector: 350 On 11/16/2001 12:31:56 PM
Final11/16/200111/16/200111/16/2001PCANC
DetailsAlan Hauser
rob ###-#### fn
Final9/28/200110/1/200110/1/2001APART
DetailsDave Lightfoot
BASEMENT AND 2ND FLOOR ONLY .....###-#### AMANDA 2 10/1/2001 12:03:54 PM 2nds floor ok 10/1/2001 12:04:54 PM
Final8/22/20018/23/20018/23/2001ANR
DetailsDixie Fellows
3rd floor ###-#### rob in caldwell...he will recall 8/23/2001 3:56:27 PM
Final8/23/20018/23/20018/23/2001PPART
DetailsDave Lightfoot
meet rob at 12:00 ###-#### 3rd floor final ok 8/24/2001 8:48:42 AM
Final8/21/20018/22/20018/22/2001ANR
DetailsDave Lightfoot
partial final on the first floor amanda ###-####
Rough-in5/23/20015/24/20015/24/2001APART
DetailsDave Lightfoot
re-insp --r/i -amanda ###-#### 2nd floor r/i ok 5/24/2001 9:21:22 AM
Rough-in4/10/20014/11/20014/11/2001APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 04/10/2001 at 15:23:46. Contact: ###-####.
rough in for cover on the third floor.
Rough-in3/15/20013/16/20013/16/2001APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/15/2001 at 14:50:05. Contact: ###-####.
basement only
Final3/12/20013/13/20013/13/2001APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/12/2001 at 15:15:49. Contact: ###-####.4TH FLOOR
Final3/6/20013/7/20013/7/2001AFAIL
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 03/06/2001 at 14:14:59. Contact: ###-####.4TH FLOOR ONLY c/n posted 3/7/2001 11:07:30 AM
Rough-in2/23/20012/26/20012/26/2001APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 02/23/2001 at 09:40:25. Contact: ###-####.--LOCATED ON 3RD FLOOR r/i for 3rd floor ok 2/26/2001 12:13:30 PM
Final2/16/20012/20/20012/20/2001AFAIL
DetailsDave Lightfoot
6th floor Brett ###-#### do not occupy 2/20/2001 11:45:17 AM
Final2/8/20012/9/20012/9/2001APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 02/08/2001 at 15:42:53. Contact: ###-####.---FOR THE 5TH FLOOR ONLY 5th floor only 2/9/2001 11:02:45 AM
Final12/20/200012/22/200012/22/2000APART
DetailsAlan Hauser
looked at the temp. comb.-air opening into basement, signed temp. card, was told dave only needed comb. air 12/22/2000 11:57:06 AM
Final12/18/200012/19/200012/19/2000ANR
DetailsDave Lightfoot
FOR FN ON 6TH FL ONLY--AMANDA ###-####
Rough-in12/11/200012/12/200012/12/2000APART
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 12/11/2000 at 16:52:36. Contact: ###-####. a rough in on the chimney flu basement thru sixth floor
Final12/8/200012/11/200012/11/2000ANR
DetailsDave Lightfoot
6th floor , and the stairwell corridor 2nd through 6th floor ###-####
Rough-in12/8/200012/11/200012/11/2000APART
DetailsDave Lightfoot
1st floor lobby and the chimney flu ###-####
Rough-in12/4/200012/5/200012/5/2000APART
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 12/04/2000 at 16:09:00. Contact: ###-####.PART R/I IN BASEMENT -2ND FL 3RD FLOOR CORADOORS ONLY
Conference11/29/200011/30/200011/30/2000APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/29/2000 at 13:33:05. Contact: ###-####.
Rough-in11/14/200011/16/200011/16/2000APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/14/2000 at 12:08:02. Contact: ###-####. 4th floor r/i ok 11/15/2000 11:51:46 AM
Rough-in11/14/200011/14/200011/14/2000PCANC
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/14/2000 at 09:27:56. Contact: ###-####. above ceiling on 4th floor
Conference11/2/200011/6/200011/6/2000APASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 11/02/2000 at 15:20:17. Contact: ###-####.
Rough-in10/2/200010/3/200010/3/2000APART
DetailsDave Lightfoot
5th floor cover of exhaust fans ###-#### 5th floor r/i ok 10/3/2000 11:27:17 AM
Rough-in9/22/20009/25/20009/25/2000APART
DetailsDave Lightfoot
4th floor only amanda ###-#### 4th floor r/i ok 9/25/2000 10:58:53 AM
Rough-in9/21/20009/22/20009/22/2000ACANC
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 09/21/2000 at 14:21:18. Contact: ###-####. partial inspection 4th floor only
Rough-in8/17/20008/18/20008/18/2000APART
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 08/17/2000 at 16:19:32. Contact: ###-####. 5th floor r/i ok 8/18/2000 11:02:07 AM
Rough-in6/26/20006/26/20006/26/2000PCANC
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 06/26/2000 at 08:37:02. Contact: ###-####. R/I ON THE 6TH FLOOR ONLY will do 6/27/00 AM 6/27/00 2:51:01 PM
Conference6/21/20006/21/20006/21/2000PPASS
DetailsDave Lightfoot
Scheduled by a contractor via Hello! on 06/21/2000 at 08:57:51. Contact: ###-####.