Final | 7/25/2000 | 7/25/2000 | 7/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
|
Final | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | FAIL |
Dave Lightfoot
|
|
|
jim--###-#### re-insp fn Not ready 7/24/00 1:07:01 PM
|
Final | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/20/2000 at 08:17:57. Contact: ###-####. Complete fireplace trim out 7/21/00 9:15:35 AM
|
Pressure Test | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PASS |
Wes Worcester
|
|
|
###-#### clinton
|
Pressure Test | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | FAIL |
Dixie Fellows
|
|
|
dan ###-####
|
Rough-in | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | PASS |
Dixie Fellows
|
|
|
see p.t for #-he thinks there is two bathrooms are there? please let me know thanks monica
|