Final | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 16:24:06. Contact: ###-####. Combustion air 12" to ceiling. 5/31/00 4:33:39 PM
|
Pressure Test | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### Gas not sized right. 4/20/00 8:22:23 AM
|
Pressure Test | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | FAIL |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 08:40:21. Contact: ###-####.
|
Pressure Test | 3/30/2000 | 3/31/2000 | 3/31/2000 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/30/2000 at 15:20:16. Contact: ###-####.
|
Rough-in | 3/30/2000 | 3/31/2000 | 3/31/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/30/2000 at 15:19:46. Contact: ###-####.
|