Final | 4/27/2000 | 4/27/2000 | 4/27/2000 | P | PASS |
Dave Lightfoot
|
|
|
keith ###-#### fn--unit heaters insulation
|
Pressure Test | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 14:56:27. Contact: ###-####. Passed 4/4/00 4/26/00 12:19:26 PM
|
Pressure Test | 4/4/2000 | 4/4/2000 | 4/4/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 09:08:48. Contact: ###-####.
|
Pressure Test | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/03/2000 at 09:01:21. Contact: ###-####. Not ready 4/4/00 9:28:55 AM
|