Final | 11/18/2000 | 11/20/2000 | 11/20/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/18/2000 at 08:04:25. Contact: ###-####.
|
Rough-in | 4/11/2000 | 4/11/2000 | 4/11/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 08:13:34. Contact: ###-####.
|
Rough-in | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 16:27:12. Contact: ###-####.
|
Rough-in | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/05/2000 at 13:46:11. Contact: ###-####. PT fail one side R/I both sides 4/6/00 3:02:49 PM
|