Final | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 09:30:43. Contact: ###-####.
|
Final | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 11:23:38. Contact: ###-####. need f/a at furn..conn gas to f/p 7/18/00 2:08:16 PM
|
Pressure Test | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 10:40:07. Contact: ###-####.
|
Rough-in | 5/23/2000 | 5/24/2000 | 5/24/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 10:39:46. Contact: ###-####.
|