Final | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 17:30:01. Contact: ###-####.
|
Final | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 11:22:17. Contact: ###-####...CALLED FRED TO MEET ME
|
Pressure Test | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### R/I ok 4/17/00 1:24:11 PM
|
Rough-in | 4/13/2000 | 4/13/2000 | 4/13/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 09:55:52. Contact: ###-####. PROVIDE DIFF ACCESS
|
Rough-in | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 10:42:20. Contact: ###-####. POSTED CORR..GEN CALLED TEJ
|