Final | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PASS |
Alan Hauser
|
|
|
###-####
|
Final | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 17:18:52. Contact: ###-####. No access- left note. 6/1/00 2:33:11 PM
|
Pressure Test | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/12/2000 at 08:31:29. Contact: ###-####.
|
Pressure Test | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | FAIL |
Dixie Fellows
|
|
|
|
Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | PASS |
Dixie Fellows
|
|
|
###-####
|