Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | A | PASS |
Dave Lightfoot
|
|
|
FP R/I ok.
|
Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 11:39:19. Contact: ###-####. Install per instructions page 9 fig. #5 4/18/00 2:04:09 PM
|