Final | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 08:47:32. Contact: ###-####. this was already done 12/19/2000 3:25:02 PM
|
Final | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PASS |
Dixie Fellows
|
|
|
reinspection ###-#### code 5575 enter
|
Final | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | FAIL |
Dixie Fellows
|
|
|
###-#### code 5575enter corrections posted 8/25/2000 2:04:28 PM
|
Final | 8/25/2000 | 8/25/2000 | 8/25/2000 | P | FAIL |
Dixie Fellows
|
|
|
###-#### code 5575enter corrections pos 8/25/2000 1:59:35 PM corrections posted 8/25/2000 2:00:17 PM
|
Rough-in | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 08:27:03. Contact: ###-####.
|