Final | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 16:33:05. Contact: ###-####.
|
Pressure Test | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/18/2000 at 08:32:33. Contact: ###-####.
|
Rough-in | 6/14/2000 | 6/15/2000 | 6/15/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 15:19:57. Contact: ###-####. Gas piping not complete 6/16/00 9:00:12 AM
|