Final | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 09:03:43. Contact: ###-####.
|
Final | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 08:54:00. Contact: ###-####.
|
Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 10:44:24. Contact: .
|
Pressure Test | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PASS |
Dave Lightfoot
|
|
|
|
Rough-in | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### Repair skin on exhaust ducts. 4/21/00 1:58:10 PM
|