Final | 5/25/2000 | 5/25/2000 | 5/25/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/25/2000 at 06:44:20. Contact: ###-####.
|
Pressure Test | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Pressure test fail (22 lbs) 4/26/00 12:10:09 PM
|
Pressure Test | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | FAIL |
Dixie Fellows
|
|
|
|
Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | PASS |
Dixie Fellows
|
|
|
###-####
|