Final | 8/4/2000 | 8/7/2000 | 8/7/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/04/2000 at 12:53:23. Contact: ###-####. pass 8/4/00 8/8/00 12:04:49 PM
|
Final | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | FAIL |
Dave Lightfoot
|
|
|
brandon ###-#### C/N posted 8/7/00 8:34:13 AM
|
Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 12:33:08. Contact: . No access 7/13/00 1:39:39 PM
|
Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
|
|
|
###-#### doneby 337 4/27/00 9:54:28 AM
|
Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
Dave Lightfoot
|
|
|
|
Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 09:16:48. Contact: ###-####. 337c/ notcompleted as of this time 4/25/00 4:49:18 PM
|
Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### All RA on 1st floor to be inducts provide 1st floor FA/ 4/26/00 12:00:28 PM
|