Final | 6/27/2000 | 6/27/2000 | 6/27/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 10:52:32. Contact: ###-####.
|
Final | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 11:00:33. Contact: ###-####. C/N posted 6/21/00 11:14:54 AM
|
Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PASS |
Russ Owen
|
|
|
|
Pressure Test | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 15:35:09. Contact: ###-####.
|
Rough-in | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 15:34:48. Contact: ###-####. No crawl space access/ C/N posted 5/4/00 4:55:55 PM
|