Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 10:36:12. Contact: ###-####.
|
Rough-in | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 17:26:14. Contact: ###-####...GAS OK FOR BLDG
|
Pressure Test | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 13:58:31. Contact: ###-####.
|
Pressure Test | 6/13/2000 | 6/13/2000 | 6/13/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/13/2000 at 11:07:17. Contact: ###-####. Welded only 60# & kitchen walls 6/14/00 8:59:23 AM
|