Final | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/28/2000 at 09:54:23. Contact: ###-####.
|
Final | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 11:36:22. Contact: ###-####.c/n seal and insulate y-branch at under floor supply plenum. 9/26/2000 11:12:44 AM
|
Rough-in | 5/17/2000 | 5/18/2000 | 5/18/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 16:56:27. Contact: ###-####. R/I and gas test ok 5/22/00 9:17:29 AM
|