Final | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### No contact no address posted 6/23/00 3:12:54 PM
|
Final | 6/22/2000 | 6/22/2000 | 6/22/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Gas test- no contact.
|
Final | 6/21/2000 | 6/21/2000 | 6/21/2000 | P | CANC |
Dixie Fellows
|
|
|
margery-- ###-#### fn done by 337 6/23/00 8:53:40 AM
|
Rough-in | 5/12/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
|
|
|
Added by Inspector: 338 On 5/12/00 c/n removed support added at the pipe transition
|
Final | 5/11/2000 | 5/11/2000 | 5/11/2000 | A | FAIL |
|
|
|
###-#### rein this is a rough insp 5/12/00 10:03:50 AM
|
Final | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | PART |
Russ Owen
|
|
|
gas line PT test ok, C/N add support at union. Called contractor. 5/5/00 10:16:03 AM
|
Final | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | CANC |
|
|
|
gas line ###-#### done by 407 5/4/00 5/4/00 7:29:25 PM
|