Final | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 08:39:21. Contact: ###-####... 11/1/2000 1:14:35 PM
|
Final | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 11:21:15. Contact: ###-####.
|
Rough-in | 5/25/2000 | 5/25/2000 | 5/25/2000 | A | PART |
Dixie Fellows
|
|
|
###-####..GAS OK
|
Rough-in | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 09:53:41. Contact: ###-####.
|
Rough-in | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 12:28:01. Contact: ###-####. c/n removed made ok to cover 5/8/00 3:31:29 PM
|
Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### C/N posted gas test ok 5/5/00 10:26:36 AM
|