Final | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PASS |
|
|
|
monte reinspection ###-#### c/n removed 7/20/2000 9:40:04 AM
|
Final | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Dave Lightfoot
|
|
|
monte--- ###-#### fn--re-insp
|
Final | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 11:48:28. Contact: ###-####. no addresses posted 7/14/2000 4:44:13 PM
|
Final | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### C/N posted 7/11/00 11:40:45 AM
|
Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | P | NR |
Dixie Fellows
|
|
|
Monty ###-####
|
Rough-in | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### Corrections not made 5/16/00 1:21:47 PM
|
Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PASS |
|
|
|
###-#### c/n removed cns done 5/16/00 2:58:51 PM
|
Rough-in | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 08:53:27. Contact: ###-####.
|
Rough-in | 5/9/2000 | 5/10/2000 | 5/10/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### Not ready 5/15/00 10:45:31 AM
|