Final | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 08:55:17. Contact: ###-####.
|
Rough-in | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 17:39:32. Contact: ###-####. 5/10/00 9:40:35 AM ok by 337 5/10/00 11:31:02 AM
|
Rough-in | 5/10/2000 | 5/10/2000 | 5/10/2000 | A | PASS |
Dave Lightfoot
|
|
|
R/I gas test ok.
|