Final | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/14/2000 at 17:09:44. Contact: ###-####.
|
Final | 6/8/2000 | 6/12/2000 | 6/12/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 14:22:38. Contact: ###-####...NEED 6" CLEAR AT W/H FLUE
|
Rough-in | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:13:03. Contact: ###-####.
|