Final | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 09:38:26. Contact: ###-####.
|
Final | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 09:28:59. Contact: ###-####. complete elec to furn-ac-range 9/5/2000 2:29:59 PM
|
Rough-in | 5/11/2000 | 5/11/2000 | 5/11/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 05/11/2000 at 07:37:48. Contact: ###-####. c/n removed 5/11/00 2:33:06 PM
|
Pressure Test | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | PASS |
Dave Lightfoot
|
|
|
|
Rough-in | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### C/N posted. 5/15/00 10:45:55 AM
|