Final | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Tom Arcoraci
|
|
|
please call first\\###-#### Susan Cantrell she can be there in 5 min.
|
Final | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/16/2000 at 09:04:41. Contact: ###-####. CALLED #..NO ANSWER
|
Pressure Test | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 13:53:57. Contact: ###-####. Left note on front door. 5/16/00 10:42:56 AM
|
Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | A | NH |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 13:53:28. Contact: ###-####. Left note on front door. 5/16/00 10:42:00 AM
|