Final | 5/18/2000 | 5/19/2000 | 5/19/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 15:44:43. Contact: ###-####.
|
Final | 5/18/2000 | 5/19/2000 | 5/18/2000 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 15:41:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/18/2000 at 15:43:31.
|
Pressure Test | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 5/17/2000 | 5/18/2000 | 5/18/2000 | A | FAIL |
Dixie Fellows
|
|
|
###-####..NO ACCESS TO EQUIP
|