Final | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 16:24:28. Contact: ###-####.
|
Pressure Test | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 11:19:40. Contact: ###-####.
|
Pressure Test | 6/15/2000 | 6/16/2000 | 6/16/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/15/2000 at 14:54:54. Contact: ###-####. Reading 17ib..notified contr... 6/16/00 10:59:28 AM
|
Rough-in | 6/2/2000 | 6/5/2000 | 6/5/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/02/2000 at 11:09:38. Contact: ###-####.
|
Rough-in | 5/26/2000 | 5/30/2000 | 5/30/2000 | P | PART |
Dixie Fellows
|
|
|
###-#### fireplace only at this time
|