Final | 7/31/2000 | 8/1/2000 | 8/1/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 15:54:00. Contact: ###-####.
|
Final | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 07:57:32. Contact: ###-####. 18" clearance @ gas range 7/26/00 10:43:30 AM
|
Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 16:02:41. Contact: ###-####.
|
Pressure Test | 5/30/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 5/30/2000 | 5/31/2000 | 5/31/2000 | P | PASS |
Alan Hauser
|
|
|
###-####
|