Final | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 10:46:12. Contact: ###-####.access code 10956
|
Final | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 10:01:37. Contact: ###-####. Left C/N 7/13/00 11:28:46 AM
|
Pressure Test | 6/8/2000 | 6/8/2000 | 6/8/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 10:16:11. Contact: ###-####.
|
Rough-in | 6/8/2000 | 6/8/2000 | 6/8/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 10:15:26. Contact: ###-####.
|
Rough-in | 6/1/2000 | 6/6/2000 | 6/6/2000 | A | NR |
Dixie Fellows
|
|
|
debra ###-#### r/i
|