Final | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 08:53:49. Contact: ###-####. Done by 411 7/24/00 1:07:06 PM
|
Final | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | PASS |
Dixie Fellows
|
|
|
PER DIXIE PASSED FOR INSP
|
Rough-in | 6/8/2000 | 6/8/2000 | 6/8/2000 | P | PASS |
Dixie Fellows
|
|
|
f/p r/i and p/t still need to be intered into the computer
|
Final | 6/5/2000 | 6/6/2000 | 6/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/05/2000 at 14:24:00. Contact: ###-####. need permit for fp 6/6/00 2:10:57 PM
|