Final | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PASS |
Steven Webb
|
|
|
fn doug --###-####
|
Final | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/14/2001 at 15:41:22. Contact: ###-####. rough ok 2/15/2001 10:40:41 AM
|
Rough-in | 7/24/2000 | 7/24/2000 | 7/24/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
Pressure Test | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 09:01:34. Contact: ###-####.
|
Rough-in | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 09:00:40. Contact: ###-####. C/N posted 7/12/00 10:45:40 AM
|