Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 10:03:28. Contact: ###-####.
|
Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 15:45:43. Contact: ###-####. signed temp occ 10/27/2000 3:13:41 PM
|
Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 16:44:25. Contact: ###-####...brian or 10/27/2000 8:45:55 AM jim 10/27/2000 8:55:10 AM no r/i inspections done..need to pop ceiling tiles to check ductwork, equipment, s/f dampers 10/27/2000 11:40:47 AM
|
Pressure Test | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/03/2000 at 11:10:19. Contact: ###-####.
|
Pressure Test | 9/21/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 16:13:16. Contact: ###-####.
|