Final | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 13:46:42. Contact: ###-####.
|
Rough-in | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | PASS |
Dave Lightfoot
|
|
|
TML MICHELLE ###-#### R/I -RE-INSP
|
Pressure Test | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | PASS |
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 14:49:36. Contact: ###-####. 24# 30 # ga. 7/10/00 1:17:52 PM
|
Rough-in | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | FAIL |
|
|
|
need protection for the gas piping at the ext wall penetration near the meter 7/10/00 1:17:31 PM
|