Final | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | CANC |
Russ Owen
|
|
|
Chris ###-#### key will a/c breaker Trans to 411. 8/30/2000 6:52:45 PM
|
Final | 8/30/2000 | 8/30/2000 | 8/30/2000 | | PASS |
Dixie Fellows
|
|
|
|
Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 16:16:56. Contact: ###-####.
|
Final | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 09:46:58. Contact: ###-####. door locked called cont 8/28/2000 2:41:17 PM
|
Final | 8/21/2000 | 8/23/2000 | 8/23/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 11:53:36. Contact: ###-####. 6" clear required for front of furn to comb doors..w/h requires drain pan 8/23/2000 3:26:02 PM
|
Pressure Test | 6/21/2000 | 6/21/2000 | 6/21/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 08:49:52. Contact: ###-####.
|
Pressure Test | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 11:16:10. Contact: ###-####.
|
Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 11:15:31. Contact: ###-####. C/N posted 6/21/00 11:52:25 AM
|
Pressure Test | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | FAIL |
Dixie Fellows
|
|
|
NO ADDRESS POSTED
|
Rough-in | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | FAIL |
Dixie Fellows
|
|
|
###-####..NO ADDRESS POSTED
|