Final | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 14:07:03. Contact: .
|
Final | 8/16/2000 | 8/17/2000 | 8/17/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/16/2000 at 14:07:03. Contact: .
|
Final | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 10:34:10. Contact: ###-####. C/N flue pipe 8/16/2000 8:49:02 AM
|
Pressure Test | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 6/14/2000 | 6/15/2000 | 6/15/2000 | A | FAIL |
Alan Hauser
|
|
|
###-####
|