Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 07:19:11. Contact: ###-####.
|
Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 415 On 10/19/2000
|
Pressure Test | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 07:41:01. Contact: ###-####.
|
Rough-in | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/12/2000 at 07:40:38. Contact: ###-####.
|