Final | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/19/2000 at 14:38:33. Contact: ###-####. occ card not on site 9/20/2000 10:55:50 AM
|
Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 08:19:11. Contact: ###-####.
|
Conference | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PASS |
Dave Lightfoot
|
|
|
PER DAVE FOR CONF--SABRINA ###-####
|
Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Dave Lightfoot
|
|
|
butch ###-#### general contractor c/n posted 7/18/00 1:57:22 PM
|
Final | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 14:32:45. Contact: ###-####. No access 7/12/00 1:10:22 PM
|
Rough-in | 6/26/2000 | 6/26/2000 | 6/26/2000 | P | FAIL |
Dave Lightfoot
|
|
|
sabrina ###-#### no access 6/27/00 2:50:42 PM
|