Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 08:20:30. Contact: ###-####.
|
Final | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 10:15:42. Contact: ###-####. single to b with 3 screws..6" to comb..a/c 3" above grnd level 7/25/00 9:31:18 AM
|
Pressure Test | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 08:38:16. Contact: ###-####.
|
Rough-in | 6/29/2000 | 6/30/2000 | 6/30/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/29/2000 at 08:37:50. Contact: ###-####.
|